3,407 sf., Constructed in twelve weeks, includes a full kitchen, bar, patio and three
dining areas. The kitchen is equipped with two exhaust hoods with heated make up
air. Unique finishes in the restaurant include polished concrete floors, wood flooring
materials installed in ceiling applications, custom made warehouse style interior
windows with applied film and operable panes, and a wall clad in reclaimed
wood. The reclaimed wood was procured from Wyoming, where it was first used
a snow fence throughout the state.
Ai3 Design
Epsten
Class A contemporary office build out
LEED Platinum Certification
Brilliant Eyes Vision Center
1690 Powder Springs Rd, Suite 101, Marietta
2,627 sf., $102,414.00
Selection criteria was qualifications and price from a select list of CM Firms.
The project was delivered on time. The quality was above expectations with the
complexity of the design and the project stayed on budget.
JKG Collaborative Design
Arista Fit Spa & Med Spa
Astoria at the Aramore
2,897 sf., Build-out of first generation high end resort spa. The build out included
new electrical and mechanical systems. The premium finishes consisted of reclaimed
Teak floors along with ceramics, stone and bamboo ceilings.
Flip Burger Boutique - Atlanta, GA
Flip I, LLC
2,680 sf., Renovation of a stand alone building. The building was converted to a
restaurant with a kitchen, full bar, and a new walk in cooler. The project included
a high end millwork package, polished and epoxy concrete floors and upholstered
booths.
Selection criteria was select bid list and bid with negotiation.