Project Experience - Educational:
Forest Park Branch Library
- Contemporary 16,000 sf. Branch Library
- Project contains computer labs, classrooms, dedicated program room and children’s areas.
Georgia Institute of Technology
2nd Floor West Tower Build-Out
- 13,136 sf., First generation build out to the existing MS&E building located on the
Georgia Tech Campus. The project consists of seven new high density lab areas
including steel lab casework, modular storefronts, acid resistant flooring and extensive
new lab equipment. The project also includes twelve new perimeter office
areas to support the new interior core lab space.
- The project was delivered on time. The quality was above expectations and the
project stayed on budget.
Darton College
- Darton College in Albany, GA
- 63,000 sf., Cafeteria, Banquet Hall, Meeting Room, Gaming
Area, Aerobics Rooms, Racquetball Courts, Bowling Lanes, Rock Climbing
Area.
- ELECTRICAL VALUE: $1.6 million
- CONSTRUCTION COST: $15 million
The Emory Clinic - Emory University
Ophthalmology Classrooms
- Atlanta, Georgia
- 15,000 sf., Renovation of an existing space in 25 year old healthcare building.
- Selection criteria included qualifications and price.
- The project was delivered on a fast track basis on time. Quality was not sacrificed
as part of the expediting process.
Georgia Institute of Technology
Institute of Paper Science and Technology
- Atlanta, Georgia
- 175,000 sf., 5 floors, Research & Instructional building, including 35 labs. Electrical service is comprised of 25KV with 3200 amp service & LAN computer communication system.
- Construction Cost: $19.5 million, Electrical Value: $2.7 million.